Skip to content
Advertisement

A radio-controlled PakBot robot opens a door inside the reactor building of Unit 2 at the Fukushima Dai-ichi nuclear power plant as the robot is monitored by another Pakbot from behind during inspection of the tsunami-damaged facilities on Monday, April 18, 2011, in Okuma, Fukushima Prefecture, Japan. (AP Photo/Tokyo Electric Power Co.)
Photo by: Anonymous
A radio-controlled PakBot robot opens a door inside the reactor building of Unit 2 at the Fukushima Dai-ichi nuclear power plant as the robot is monitored by another Pakbot from behind during inspection of the tsunami-damaged facilities on Monday, April 18, 2011, in Okuma, Fukushima Prefecture, Japan. (AP Photo/Tokyo Electric Power Co.)

Featured Photo Galleries