Skip to content
Advertisement

Boeing employee's conduct simulation production training in the Final Assembly Building on June 16, 2011 in Charleston, SC. The training simulates how the 787 Dreamliner would move through production at the facility. The Final Assembly Building  will be home to the second 787 Dreamliner final assembly and delivery facility. The building is the size of 10.5 football fields and can house two 787 Dreamliners wingtip to wingtip. Boeing will be able to deliver three airplanes per month. (Jeremy Lock/Special to The Washington Times)
Photo by: Jeremy Lock/Special to The Washi
Boeing employee's conduct simulation production training in the Final Assembly Building on June 16, 2011 in Charleston, SC. The training simulates how the 787 Dreamliner would move through production at the facility. The Final Assembly Building will be home to the second 787 Dreamliner final assembly and delivery facility. The building is the size of 10.5 football fields and can house two 787 Dreamliners wingtip to wingtip. Boeing will be able to deliver three airplanes per month. (Jeremy Lock/Special to The Washington Times)

Featured Photo Galleries