Skip to content
Advertisement

Boeing employees work in the 787 Dreamliner aft-body-assembly building on Thursday, June 16, 2011, in Charleston, S.C. The building is the size of 10.5 football fields and can house two 787 Dreamliners wingtip to wingtip. Boeing will be able to deliver three airplanes per month. (Jeremy Lock/Special to The Washington Times)
Photo by: Jeremy Lock/Special to The Washi
Boeing employees work in the 787 Dreamliner aft-body-assembly building on Thursday, June 16, 2011, in Charleston, S.C. The building is the size of 10.5 football fields and can house two 787 Dreamliners wingtip to wingtip. Boeing will be able to deliver three airplanes per month. (Jeremy Lock/Special to The Washington Times)

Featured Photo Galleries