Skip to content
Advertisement

Boeing Tool Service employee's  Kelly Gates and Christian Moraga from Everett WA. are preparing locations in the Final Assembly Building to set up tools on June 16, 2011 in Charleston, SC. In July 2011 construction is to be completed on Boeing's Final Assembly Building  which will be home to the second 787 Dreamliner final assembly and delivery facility. The building is the size of 10.5 football fields and can house two 787 Dreamliners wingtip to wingtip. Boeing will be able to deliver three airplanes per month. (Jeremy Lock/Special to The Washington Times)
Photo by: Jeremy Lock/Special to The Washi
Boeing Tool Service employee's Kelly Gates and Christian Moraga from Everett WA. are preparing locations in the Final Assembly Building to set up tools on June 16, 2011 in Charleston, SC. In July 2011 construction is to be completed on Boeing's Final Assembly Building which will be home to the second 787 Dreamliner final assembly and delivery facility. The building is the size of 10.5 football fields and can house two 787 Dreamliners wingtip to wingtip. Boeing will be able to deliver three airplanes per month. (Jeremy Lock/Special to The Washington Times)

Featured Photo Galleries