Skip to content
Advertisement

Senior Reactor Operator Christina Renaud, left, speaks with Training Supervisor Paul Gresh, center, and Control Room Supervisor Bob Sheridan, right, in the Control Room Simulator moments before a simulated reactor shutdown, Tuesday, May 28, 2019, at a training facility several miles from the Pilgrim Nuclear Power Station, in Plymouth, Mass. The simulated shutdown was performed in front of members of the media Tuesday ahead of the planned actual shutdown of the aging reactor on Friday, May 31. (AP Photo/Steven Senne)

Senior Reactor Operator Christina Renaud, left, speaks with Training Supervisor Paul Gresh, center, and Control Room Supervisor Bob Sheridan, right, in the Control Room Simulator moments before a simulated reactor shutdown, Tuesday, May 28, 2019, at a training facility several miles from the Pilgrim Nuclear Power Station, in Plymouth, Mass. The simulated shutdown was performed in front of members of the media Tuesday ahead of the planned actual shutdown of the aging reactor on Friday, May 31. (AP Photo/Steven Senne)

Featured Photo Galleries