Skip to content
Advertisement

FILE - In this June 8, 2017 file photo, fresh nuts, bolts and fittings are ready to be added to the east leg of the pipeline near St. Ignace as Enbridge prepares to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich. Enbridge Inc. applied Wednesday, April, 2020, for state and federal authorization to construct an oil pipeline tunnel beneath the Michigan waterway that connects two of the Great Lakes. (Dale G Young/Detroit News via AP)/Detroit News via AP)

FILE - In this June 8, 2017 file photo, fresh nuts, bolts and fittings are ready to be added to the east leg of the pipeline near St. Ignace as Enbridge prepares to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich. Enbridge Inc. applied Wednesday, April, 2020, for state and federal authorization to construct an oil pipeline tunnel beneath the Michigan waterway that connects two of the Great Lakes. (Dale G Young/Detroit News via AP)/Detroit News via AP)

Featured Photo Galleries