Skip to content
Advertisement

FILE - In this June 8, 2017m file photo, fresh nuts, bolts and fittings are ready to be added to the east leg of the pipeline near St. Ignace, Mich., as Enbridge prepares to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich. In a letter Monday, Jan. 29, 2018, Gov. Rick Snyder has rejected a call to shut down twin oil pipelines in the Great Lakes waterway so their external coating can be inspected for gaps, saying the state could run short of propane if the flow of oil and liquid natural gas through the Line 5 pipeline were halted during winter. (Dale G Young/Detroit News via AP, File)

FILE - In this June 8, 2017m file photo, fresh nuts, bolts and fittings are ready to be added to the east leg of the pipeline near St. Ignace, Mich., as Enbridge prepares to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich. In a letter Monday, Jan. 29, 2018, Gov. Rick Snyder has rejected a call to shut down twin oil pipelines in the Great Lakes waterway so their external coating can be inspected for gaps, saying the state could run short of propane if the flow of oil and liquid natural gas through the Line 5 pipeline were halted during winter. (Dale G Young/Detroit News via AP, File)

Featured Photo Galleries