Skip to content
Advertisement

Fresh nuts, bolts and fittings are ready to be added to the east leg of the pipeline near St. Ignace on Thursday, June 8, 2017, as Enbridge prepares to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich. (Dale G Young/Detroit News via AP)

Fresh nuts, bolts and fittings are ready to be added to the east leg of the pipeline near St. Ignace on Thursday, June 8, 2017, as Enbridge prepares to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich. (Dale G Young/Detroit News via AP)

Featured Photo Galleries