Skip to content
Advertisement

In this Aug. 21, 2017, file photo, workers make sure that each section of the Enbridge replacement Line 3 that is joined passes muster in Superior, Wisc. After President Joe Biden revoked Keystone XL's presidential permit and shut down construction of the long-disputed pipeline that was to carry oil from Canada to Texas, opponents of other pipelines hoped the projects they've been fighting would be next. (Richard Tsong-Taatarii /Star Tribune via AP) ** FILE **

In this Aug. 21, 2017, file photo, workers make sure that each section of the Enbridge replacement Line 3 that is joined passes muster in Superior, Wisc. After President Joe Biden revoked Keystone XL's presidential permit and shut down construction of the long-disputed pipeline that was to carry oil from Canada to Texas, opponents of other pipelines hoped the projects they've been fighting would be next. (Richard Tsong-Taatarii /Star Tribune via AP) ** FILE **

Featured Photo Galleries