Skip to content
Advertisement

FILE - This April 15, 2019, file image released by Tokyo Electric Power Co. (TEPCO) shows an operation to remove fuel from a cooling pool at Unit 3 of the Fukushima nuclear plant in Okuma town, Fukushima prefecture, northeastern Japan. Japan’s economy and industry ministry unveiled a draft revision Monday, Dec. 2, 2019, to its decades-long roadmap to clean up the radioactive mess at the Fukushima nuclear power plant, which was wrecked by a massive earthquake and tsunami in 2011. (Tokyo Electric Power Co. via AP, File)

FILE - This April 15, 2019, file image released by Tokyo Electric Power Co. (TEPCO) shows an operation to remove fuel from a cooling pool at Unit 3 of the Fukushima nuclear plant in Okuma town, Fukushima prefecture, northeastern Japan. Japan’s economy and industry ministry unveiled a draft revision Monday, Dec. 2, 2019, to its decades-long roadmap to clean up the radioactive mess at the Fukushima nuclear power plant, which was wrecked by a massive earthquake and tsunami in 2011. (Tokyo Electric Power Co. via AP, File)

Featured Photo Galleries