Skip to content
Advertisement

The 1,000-ton deckhouse of the future destroyer USS Zumwalt (DDG 1000) is craned toward the deck of the ship to be integrated with the ship's hull at General Dynamics Bath Iron Works. The ship launch and christening are planned in 2013. BATH , Maine (Dec. 14, 2012) (U.S. Navy photo)

The 1,000-ton deckhouse of the future destroyer USS Zumwalt (DDG 1000) is craned toward the deck of the ship to be integrated with the ship's hull at General Dynamics Bath Iron Works. The ship launch and christening are planned in 2013. BATH , Maine (Dec. 14, 2012) (U.S. Navy photo)

Featured Photo Galleries